cancel
Showing results for 
Search instead for 
Did you mean: 

New package...and 80% slower speed. WOW

firedemon1
Dabbler
Posts: 14
Registered: ‎19-11-2009

Re: New package...and 80% slower speed. WOW

HMMMMMMMMMMMM
Well, it says it's coming - 28/02/2010
Now, let's say that by some weird stretch of the imagination BT actually do this on time, how long after the exchange upgrade can PN up my speed? (Sorry if the question's a bit naiive)
Oh, and I wish I'd started coming here many moons ago - I'm learning a lot in a short time.  Thanx guys
Mand
Grafter
Posts: 5,560
Thanks: 2
Registered: ‎05-04-2007

Re:New package...and 80% slower speed. WOW

Assuming the BT date is met we can upgrade you in 5 days. Smiley
firedemon1
Dabbler
Posts: 14
Registered: ‎19-11-2009

Re:New package...and 80% slower speed. WOW

Cheesy Cheesy Cheesy Cheesy
"GO BT GO"

[Moderator's note by Barry Zubel:  Full quote of preceding post removed, as per Forum Rules ]
firedemon1
Dabbler
Posts: 14
Registered: ‎19-11-2009

Re: New package...and 80% slower speed. WOW

It's been a long while since I updated this thread. 
Now it looks as if BT will have done their bit at the end of this month.
My question is, will I need to do anything to get the new faster speeds or will it happen automatically?
orbrey
Plusnet Alumni (retired)
Plusnet Alumni (retired)
Posts: 10,540
Registered: ‎18-07-2007

Re: New package...and 80% slower speed. WOW

We'll need to place the order manually as soon as your exchange is enabled, so we'll keep an eye out for you. If you post back here or drop one of us a PM we can get the order placed.
firedemon1
Dabbler
Posts: 14
Registered: ‎19-11-2009

Re: New package...and 80% slower speed. WOW

Excellent - thanks Matt, will do