Hi folks,
like so many of us currently without FTTC I have been checking the above for some idea of (if) when fibre is a coming.
I have been checking since February 2017 when I was moved onto a (new) infill fibre cabinet. By the end of Feb. the BT OR site was indicating "connect" and an enquiry to BT OR stated 4 months to service.
The site now indicates "activate" and states service typically within the "next month". However it has been like that for the last 3 months!
Enquiries to PN just result in a reference to the same site, hence I am still checking and waiting. With BT OR not end user facing where can you obtain some information more useful and relevant.
I am connected to cabinet 8 on the Bow Street telephone exchange.
cheers