I walk to the pathway today and saw there is five BT Openreach van installing fibre from the main road all the way to my cabinet box there. I spoken to Openreach men and they say new FTTC cabinet will be installing next week next to cabinet number 8 box there. He say the FTTC should be ready before November 2013. I can't wait for Plusnet FTTC soon.
I took two photos today: